Electric Powered Engine
Las Vegas Material Handling Preventitive Maintenance
Electric Powered Engine
Las Vegas Material Handling offers two Preventive Maintenance options for electric powered engines;
Plan A (Approx. 900 Hours)
- Blow off unit when required
- Check operation of horn, brakes, steering, parking brake & gauges
- Check all oil levels — Differential hydraulic system, master cylinder
- Check hydraulic pump, control valve and all lines for leaks
- Check mast and carriage for operation and free play
- Check lift and tilt cylinders
- Lubricate unit
- Check battery electrolytic level, load test, ground test
- Check power cables
- Check wire harness
- Check contact tips
- Check and adjust all micro switches
- Check speed potentiometer
- Check and grease load and castor wheels
- Grease bull gears and jack shafts A C units only (excluding planetary drive)
- Check brake shoes and wheel cylinders, repack bearings (when accessible)
- Check master cylinder and brake lines
- Check steering system and repack steer wheel bearings
- Check motor brusher (when accessible)
- Check hydraulic oil, change hydraulic oil, filter and external breather, if necessary
- Clean off electrical components, if necessary
Plan B (Approx. 300 hours)
- Blow off unit when required
- Check operation of horn, brakes, steering, parking brake & gauges
- Check all oil levels — Differential hydraulic system, master cylinder
- Check hydraulic pump, control valve and all lines for leaks
- Check mast and carriage for operation and free play
- Check lift and tilt cylinders
- Lubricate unit
- Check battery electrolytic level, load test, ground test
- Check power cables
- Check wire harness
- Check contact tips
- Check and adjust all micro switches
- Check speed potentiometer
- Check and grease load and castor wheels




