Electric Powered Engine

 

Las Vegas Material Handling Preventitive Maintenance

Electric Powered Engine 

Las Vegas Material Handling offers two Preventive Maintenance options for electric powered engines;

Plan A (Approx. 900 Hours)

  • Blow off unit when required
  • Check operation of horn, brakes, steering, parking brake & gauges
  • Check all oil levels — Differential hydraulic system, master cylinder
  • Check hydraulic pump, control valve and all lines for leaks
  • Check mast and carriage for operation and free play
  • Check lift and tilt cylinders
  • Lubricate unit
  • Check battery electrolytic level, load test, ground test
  • Check power cables
  • Check wire harness
  • Check contact tips
  • Check and adjust all micro switches
  • Check speed potentiometer
  • Check and grease load and castor wheels
  • Grease bull gears and jack shafts A C units only (excluding planetary drive)
  • Check brake shoes and wheel cylinders, repack bearings (when accessible)
  • Check master cylinder and brake lines
  • Check steering system and repack steer wheel bearings
  • Check motor brusher (when accessible)
  • Check hydraulic oil, change hydraulic oil, filter and external breather, if necessary
  • Clean off electrical components, if necessary

Plan B (Approx. 300 hours)

  • Blow off unit when required
  • Check operation of horn, brakes, steering, parking brake & gauges
  • Check all oil levels — Differential hydraulic system, master cylinder
  • Check hydraulic pump, control valve and all lines for leaks
  • Check mast and carriage for operation and free play
  • Check lift and tilt cylinders
  • Lubricate unit
  • Check battery electrolytic level, load test, ground test
  • Check power cables
  • Check wire harness
  • Check contact tips
  • Check and adjust all micro switches
  • Check speed potentiometer
  • Check and grease load and castor wheels

 


 

 

 

Las Vegas Material Handling

5260 Cameron Street Suite B
Las Vegas, Nevada 89118